Xiaowan Dam
Arch dam · Yunnan, China
Xiaowan Dam is an arch dam on the Mekong (Lancang) in Yunnan, China, standing 292 m (958 ft) high and completed in 2010. It carries an installed hydroelectric capacity of 4,200 MW. The structure impounds Xiaowan Reservoir.
The Xiaowan Dam (simplified Chinese: 小湾坝; traditional Chinese: 小灣壩; pinyin: Xiǎowān Bà) is an arch dam on the Lancang (Mekong) River in Nanjian County, Yunnan Province in southwest China. The primary purpose of the dam is hydroelectric power generation and it supports a 4,200 MW power station. Constructed between 2002 and 2010 by Huaneng Power International at a cost of ¥32 billion (nearly US$3.9 billion), it is the world's second highest arch dam at 292 m (958 ft). It is also third highest among dams of all types behind Jinping-I and Nurek and the third largest hydroelectric power station in China.
Adapted from Wikipedia: Xiaowan Dam (CC BY-SA 4.0).
- Dam type
- Arch Dam
- Structural height
- 292 m (958 ft)
- Installed capacity
- 4,200 MW
- Impounded river
- Mekong (Lancang)
- Reservoir
- Xiaowan Reservoir
- Location
- Yunnan, China
- Year completed
- 2010
- Height rank
- #3 of 115 indexed
- Output rank
- #17 of 102 indexed
- Coordinates
- 24.7003°, 100.0911°
Notable: World's second-tallest arch dam (292 m), generating clean hydro power from the alpine Upper Mekong.
Among the 115 dams indexed in YearMaps, Xiaowan Dam ranks #3 by structural height, behind Jinping-I Dam (305 m). By installed generating capacity it ranks #17, behind Three Gorges Dam (22,500 MW).
Nearest cities: Baoshan (106 km), Dali (112 km), Chuxiong (151 km).
More about Xiaowan Dam
Background
The feasibility study for the dam was completed in 1992, with it as part of the Lancang River Project. In 1995 the report was reviewed and approved by the Chinese government. Three years later in 1998, a consortium to fund and construct the dam was organized. In 1999, preliminary construction (roads, bridges, river diversion) began. Official construction on the dam started on 1 January 2002. The river was diverted by November 2003 and concrete pouring began in 2005. The river diversion was closed and the reservoir began to impound in November 2007. The first generator was commissioned in September 2009 and the dam was complete in March 2010. The last of the six generators went operational on 22 August 2010.
Sections adapted from Wikipedia: Xiaowan Dam (CC BY-SA 4.0).
