Iron Gate I Dam
Concrete Gravity dam · Romania / Serbia
Iron Gate I Dam is a concrete gravity dam on the Danube in Romania / Serbia, standing 60 m (197 ft) high and completed in 1972. It carries an installed hydroelectric capacity of 2,192 MW. The structure impounds Iron Gate Reservoir.
The Iron Gate I Hydroelectric Power Station (Romanian: Porțile de Fier I, Serbian: Ђердап I/Đerdap I) is the largest dam on the Danube river and one of the largest hydro power plants in Europe. It is located on the Iron Gate gorge, between Romania and Serbia.
The Romanian side of the power station produces approximately 5.24 TWh annually, while the Serbian side of the power station produces 5.65 TWh.
Adapted from Wikipedia: Iron Gate I Hydroelectric Power Station (CC BY-SA 4.0).
- Dam type
- Concrete Gravity
- Structural height
- 60 m (197 ft)
- Installed capacity
- 2,192 MW
- Impounded river
- Danube
- Reservoir
- Iron Gate Reservoir
- Location
- Romania / Serbia
- Year completed
- 1972
- Height rank
- #71 of 115 indexed
- Output rank
- #29 of 102 indexed
- Coordinates
- 44.6708°, 22.5292°
Notable: Largest dam on the Danube and one of Europe's largest hydro facilities, taming the historic Danube cataracts.
Among the 115 dams indexed in YearMaps, Iron Gate I Dam ranks #71 by structural height, behind Jinping-I Dam (305 m). By installed generating capacity it ranks #29, behind Three Gorges Dam (22,500 MW).
Nearest cities: Drobeta-Turnu Severin (11 km), Târgu Jiu (72 km), Reșița (86 km).
More about Iron Gate I Dam
History
The project started in 1964 as a joint-venture between the governments of Romania and Yugoslavia for the construction of a major dam on the Danube River which would serve both countries. At the time of completion in 1972, it was the 10th largest hydroelectric power stations in the world with twelve Kaplan turbines generating 2,052 MW, divided equally between the two countries at 1,026 MW each.
The small inhabited island of Ada Kaleh was submerged during the construction.
As the original turbines' 30 years lifespan came to an end, in 1998 the Romanian half of the dam started a program of modernization. As part of this program, the first of the turbines was stopped in 1999. By 2007 the program was completed and the Romanian half of the dam's operations were back to full capacity.
Sections adapted from Wikipedia: Iron Gate I Hydroelectric Power Station (CC BY-SA 4.0).